South Locker Room
Reopening the room's original skylight, new wood floor to
match the original, wood trim and baseboard, new electrical wiring,
paint, and minor improvements.

Here a worker with Floors Inc. installs a new floor using planks
salvaged
from another building. Unlike the rest of the second floor, the
former bath
and locker rooms only had one layer of wood floor under the 1950s
era vinyl tile. Although plans called to refinish these origional
floors, years of use had damaged them beyond repair.
| < back | 1
| 2 | 3 |
4 | 5 | 6
| 7 | 8 [
9 ] 10 | 11
| 12 | 13 | next
> |
Aurora
Regional Fire Museum PO Box 1782
Aurora, IL 60507
Phone: (630) 892-1572 e-mail: ARFMinfo@aol.com